工程案例

Engineering case

防洪工程

发布时间:

2022-10-17 09:34

Philippine Flood Control Project

Cooperation time:

2018-2019

Cooperative unit:

Philippine

Material supply:

Steel sheet pile,Seamless pipe

The project overcomes a series of problems such as the difficulty of excavation and embankment construction caused by the difficulty of excavation and embankment construction due to the low foundation bearing capacity and high groundwater level, and the construction equipment cannot work normally on this soft foundation. The project was successfully completed, and the building materials and steel required for the project played a major supporting role.

服务热线:+86- 15901336550 / +86- 10- 85999901

公司地址:北京市通州区新华西街58号万达广场A座2522室

Copyright © 2022 中联韩创(北京)金属材料有限公司   网站建设:中企动力 北二分   京ICP备15005777号-1   SEO标签